Gas Boiler House
The construction of a gas boiler house for the production of low-pressure saturated steam for Moravskoslezské cukrovary s.r.o. took place between 2024 and 2025. The sugar factories, together with ČEZ ESCO, built a new, more environmentally friendly gas boiler house that replaced the original coal-fired sources. The project was implemented by ČEZ Energetické služby.
KOFING participated in the supply and assembly of the steel structure for the working platform. This was followed by pre-assembly work on the air preheaters (LUVO) and assembly work in the sections of the gas steam boiler house, natural gas and biogas distribution systems, and the steam output connection.