Gas Boilers for SEA Zlín
For SEA Zlín a.s., we participated in the assembly work for the modification of 2 gas boilers, K13 and K14, in Karviná. Both boilers were manufactured by a different company in the past, but unfortunately, they did not meet the required parameters and thus failed to fulfill their purpose. SEA therefore proposed a repair solution, which primarily included modifications to the boiler body, as well as the replacement of the economizer and piping.
KOFING took charge of the dismantling work, the supply and installation of piping, the supply and installation of the fan and air duct, natural gas piping, valves, and pumps, including all relevant tests and inspections. We also participated in the construction of a new shelter for the air fan, and in the removal and installation of insulation on the rear part of the boiler.