Gas Boilers for SEA Zlín

For SEA Zlín a.s., we participated in the assembly work for the modification of 2 gas boilers, K13 and K14, in Karviná. Both boilers were manufactured by a different company in the past, but unfortunately, they did not meet the required parameters and thus failed to fulfill their purpose. SEA therefore proposed a repair solution, which primarily included modifications to the boiler body, as well as the replacement of the economizer and piping.

KOFING took charge of the dismantling work, the supply and installation of piping, the supply and installation of the fan and air duct, natural gas piping, valves, and pumps, including all relevant tests and inspections. We also participated in the construction of a new shelter for the air fan, and in the removal and installation of insulation on the rear part of the boiler.

What we did

For more information, please do not hesitate to contact us. Contact us.

Our Contact

This website uses cookies.

We use cookies to personalize content and ads, provide social media features and analyze our traffic. We also share information about the use of our site with our social media, advertising and analytics partners. They may use the data together with other information they collect about you while using their services.

Deny all
Show details
Allow all