Manufacture and assembly of the steel structure for a natural gas steam boiler on the premises of the Ostrava chemical plant. The work also included the complete assembly of a boiler with a capacity of 25 t/h, the installation of DN200 natural gas piping, DN25 condensate piping, and DN80 demineralized water piping. Furthermore, it involved performing the necessary non-destructive testing of welds, pressure tests, surface protection, and piping insulation, including comprehensive testing of the boiler.

Implementation period: 2020 – 2021

What we did

For more information, please do not hesitate to contact us. Contact us.

Our Contact

This website uses cookies.

We use cookies to personalize content and ads, provide social media features and analyze our traffic. We also share information about the use of our site with our social media, advertising and analytics partners. They may use the data together with other information they collect about you while using their services.

Deny all
Show details
Allow all