Reconstruction of the Mill Circuit Piping for Boilers K1 and K4

The subject of the turnkey project was the dismantling of the existing flue gas ducts and the manufacture, including the assembly, of new piping for the mill circuits of boilers K1 and K4 at the Karviná Heating Plant.

The existing flue gas ducts were replaced with new ones within the scope of the project documentation. The new routes consist of several circular ducts and a vertical rectangular duct.

Segmental elbows, T-pieces, transition pieces, and fabric expansion joints for the elimination of thermal expansion are present in all routes. All flue gas ducts were equipped with thermal insulation and clad with galvanized sheet metal, which is designed to be removable at the locations of the dampers.

Implementation period: 2020

What we did

For more information, please do not hesitate to contact us. Contact us.

Our Contact

This website uses cookies.

We use cookies to personalize content and ads, provide social media features and analyze our traffic. We also share information about the use of our site with our social media, advertising and analytics partners. They may use the data together with other information they collect about you while using their services.

Deny all
Show details
Allow all